Tue, 22 May 2012, 4:37pm Price List for Manufactured Items »
Music101
Warrior
Periwinkle
Registered: Aug, 2010
Last visit: Thu, 19 Dec 2013
Posts: 66

This is going to be a quite long thread..

This is for people asking for some price list, as you know economy now has already been really bad, the last time i played was around 2008-2009, and economy was not that bad, Female Fur can be bought at around 300-500k only, but now i was shocked that it was 10m.

Where the hell am i going to get that .. XD so instead of bursting and leveling i just focused on making items and manufacture things. I can say that i might not be expert on this but i can tell im a little Pro when it comes to Manufacturing (which i know some of you dislikes because of the time being spent, but honestly i enjoy it..)

Here are some of the examples, and these are also the most requested items being ordered to my Alt Manufacturer. The prices im going to indicate here is the Raw Materials vs Manufacturing Time, meaning all is Manually manufactured. But if you are expert with compounding basic materials (ex: copper sand, hard alu, alu plate) this will be an advantage on lessening the time elapsed, this will spare a lot of your time.Materials are just easy to get as we all know and my prices as well for the raw materials will be low, but the time spent is the big deal.

For Time Elapsed, before i only use to charge 50g per minute, but due to the bad economy, prices has tripled, even x4, so i decided to triple the charge as well so i can go with the flow of the economy. so i will charge 150g per minute.

AIRCON (32 Minutes):
http://wlodb.com/files/aircon.JPG
Here are the Main Items to make an Aircon:

2 Acrylic Plate:
2 naphtha = 500 each = 1000
4 rubber = 100 each = 400
total = 1400
Time Elapsed: 52 Minutes

Pail Refrigerant:
2 Steel = 1500 each = 3000
3 Amonia (composed of 2 iron fillet, 1 alu plate,2 pure water, 1 sea salt) = 2500 each = 7500
1 Sealed Potion (composed of naphtha, orig rubber and fire wood) = 600 each
3 Water Pipe (composed of Acrylic plate) = 600 each = 1800
Total = 12,900
Time Elapsed: 235 minutes

DC Motor:
2 Iron Shell = 1000 each = 2000
2 Enamel Wire = 200 each = 400
6 Wires = 500 each = 3000
2 Magnet = 1000 each = 2000
Total: 7200
Time Elapsed: 100 minutes

Propeller = 100 each
Total =100
Time Elapsed: 4 minutes

Precision Circuit
2 Electonic Crystal (composed of Silicon, Tin Material and Black Clay) = 1000 each = 2000
4 Resistance (can be bought to Universal 30g each) = 120
3 Capacitance (can be bought to Universal 30g each) = 90
1 Winding (2 enamel wire and rubber) = 500
Total: 2710
Time Elapsed: 121 Minutes

So, If we are going to total the amount being spent, It would give you a total amount of 24,310g.
For Time Elapsed, aircon will give you 544 minutes in total giving you 544x150g=81,600g.
So for Aircon, it would be for a total of: 105,910g. But i only sell it for 100,000g to make it exact.

ATM (40 Minutes):
http://wlodb.com/files/atm.JPG
Here are the Main Item to make ATM::

Precision Circuit x 3
(Please refer price @ the aircon)
Total Amount per Precision: 2710 x 3 = 8130
Time Elapsed : 121 Minutes x 3 = 363 Minutes

Sophisticated Device
4 Copper = 200 each = 800
4 Special Nail = 50 each = 200
4 Wire = 500 each = 2000
1 Electronic Wire (can be bought to Universal 30g each) = 30
Total: 3030
TIme Elapsed: 97 Minutes

6 Steel = 1500 each = 9000
Total: 9000
Time Elapsed: 10 Minutes per steel x 6 = 60 Minutes

2 Plastic = 2500 each = 5000
Total: 5000
Time Elapsed: 40 Minutes

Total Amount Spent for Raw Materials: 25,160g.
Total Time Elapsed (based on the calculation) : 600 Minutes but based on the wlodb's calculation it is 524 Minutes (Probably because of the precision Circuit) so I'm going to follow the wlodb Time so 524x150 = 78,600.
ATM total Price: 103,760g. But i round it down to 100,000g

COIN MACHINE (39 Minutes):
http://wlodb.com/files/coin_machine.JPG
Here are the Main Item to make a Coin Machine

3 Acrylic Plate
3 naphtha = 500 each = 1500
6 rubber = 100 each = 600
total = 2100
Time Elapsed: 78 Minutes

2 Steel = 1500 each = 3000
Total: 3000
Time Elapsed: 20 Minutes

2 Plastic = 2500 each = 5000
Total: 5000
Time Elapsed: 40 Minutes

1 Paper = 50
Total: 50
Time Elapsed: 1 Munite

2 Wire = 100 each = 200
Total: 200
Time Elapsed: 4 Minutes

Total Amount Spent for Raw Materials: 10,350
Total Time Elapsed (based on wlodb information): 182 Minutes. So, 182x150= 27,300
Coin Machine Total Price: 37,650, round down to 35,000

ELEVATOR (30 Minutes):
http://wlodb.com/files/elevator.JPG
Here are the Main Material to make an Elevator:

3 Link Gear Unit - 3500 each = 10,500
(Composed of 2 Big Wooden Gear, 6 Medium Wooden Gear, 4 Small Wooden Gear, Metal Gear and Lubricant)
Total: 10,500
Total Time Elapsed: 99 Munites per Link Gear Unit x 3 = 279 Muinites

1 Sophisticated Device:
4 Copper = 200 each = 800
4 Special Nail = 50 each = 200
4 Wire = 500 each = 2000
1 Electronic Wire (can be bought to Universal 30g each) = 30
Total: 3030
TIme Elapsed: 97 Minutes

2 Cable = 150 each = 300
Total: 300
TIme Elapsed: 4 Minutes

5 Alloy = 2500 each = 12,500
(Composed of Steel, Copper Plate and Alu Plate)
Total: 12,500
Time Elapsed: 29 Minutes x 5 = 145 Minutes

1 AC Motor:
5 Iron Shell = 1000 each = 5000
2 Enamel Wire = 200 each = 400
4 Wires = 500 each = 2000
2 Magnet = 1000 each = 2000
1 Iron Fillet = 200 each = 200
Total: 9600
Time Elapsed: 105 Minutes

Total Amount Spent for Raw Materials: 35,930
Total Time Elapsed (based on wlodb information): 684 Minutes, So, 684x150=102,600
Elevator Total Price 138,530, round down to 135,000

FRIDGE (30 Minutes):
http://wlodb.com/files/fridge.JPG
Here are the Main Material to make a Fridge:

Compressor
1 AC Motor
5 Iron Shell = 1000 each = 5000
2 Enamel Wire = 200 each = 400
4 Wires = 500 each = 2000
2 Magnet = 1000 each = 2000
1 Iron Fillet = 200 each = 200
--------------------------------------
2 Pail Rerigerant:
4 Steel = 1500 each = 6000
6 Amonia (composed of 2 iron fillet, 1 alu plate,2 pure water, 1 sea salt) = 2500 each = 15,000
2 Sealed Potion (composed of naphtha, orig rubber and fire wood) = 600 each = 1,200
6 Water Pipe (composed of Acrylic plate) = 600 each = 3600
--------------------------------------
Propeller = 100 each
--------------------------------------
Total for Compressor: 35,500
Time Elapsed: 563 Minutes

4 Steel = 1500 each = 6000
Total: 6000
Total Time Elapsed: 40 Minutes

4 Acrylic Plate
4 naphtha = 500 each = 2000
8 rubber = 100 each = 800
total = 2800
Time Elapsed: 104 Minutes

1 Sophisticated Device:
4 Copper = 200 each = 800
4 Special Nail = 50 each = 200
4 Wire = 500 each = 2000
1 Electronic Wire (can be bought to Universal 30g each) = 30
Total: 3030
TIme Elapsed: 97 Minutes

Total Amount Spent for Raw Materials: 47,330
Total Time Elapsed (based on wlodb information): 834 Minutes, So, 834x150=125,100
Fridge Total Amount: 172,430 (but i sell this one for 200,000k but they can still negotiate until 170k)

Note: This information is MY PERSONALway of computing manufactured items. If you think its a little bit overprice feel free to tell it, but as i told you this is just my personal way of computing Manufactured materials. Another note is that the Raw Material Prices are not my OWN PRICE . I just based it on what i see on the SHOPS so i can go with the economy's flow. :) please respect the post if there is disagreement. Thank you! Hope this helps too!

If you have some manufactured items that you want me to make a computation for you, just tell me and i will try my best to compute it asap.

Oh Just to make another note XD I'm at Virgo Server so i dont know the price range for other servers :)

Last edited Tue, 22 May 2012, 5:24pm by Music101


http://fc07.deviantart.net/fs70/f/2009/358/7/2/Tony_Tony_Chopper_Siggy_by_RyuuketsuEG.png

Offline