Total Time: 68 minute(s)
Raw Materials |
---|
 Wood x 4   |
 Harl Grass x 8   |
 Sea Water x 6   |
 Coal Ore x 6   |
 Cotton x 8   |
Tasks |
---|
 Linen Thread x 4 (4 minute(s) with Spinning Machine) |
 Cotton Thread x 8 (8 minute(s) with Spinning Machine) |
 Fresh Water x 6 (0 minute(s) with Water Desalination) |
 Ordinary Wood x 6 (0 minute(s) with Stone Knife) |
 Firewood x 12 (0 minute(s) with Stone Knife) |
 Coal Sand x 6 (12 minute(s) with Hot Kiln) |
 Coal Ball x 6 (12 minute(s) with Hot Kiln) |
 Nylon x 6 (24 minute(s) with Hot Kiln) |
 Red Carpet x 1 (8 minute(s) with Auto Loom) |
New Manufacture | Edit | Back