Total Time: 90 minute(s)
Raw Materials |
---|
 Wood x 14   |
 Shot Put x 2   |
 Iron Ore x 24   |
 Oak x 1   |
 Original Rubber x 8   |
Tasks |
---|
 Steel String x 1 (4 minute(s) with Grinding Equipment) |
 Charcoal x 8 (8 minute(s) with Low-Temperature Kiln) |
 Ordinary Wood x 24 (0 minute(s) with Stone Knife) |
 Firewood x 48 (0 minute(s) with Stone Knife) |
 Iron Material x 12 (24 minute(s) with Melting Furnace) |
 Steel x 4 (8 minute(s) with Hot Kiln) |
 Oak Wood x 2 (0 minute(s) with Stone Knife) |
 Wooden Pulley x 2 (12 minute(s) with Rope Saw) |
 Rubber x 4 (4 minute(s) with Low-Temperature Kiln) |
 Bicep Exerciser x 1 (30 minute(s) with Welding Tool) |
New Manufacture | Edit | Back