Expand All | Collapse All


Total Time: 303 minute(s)

Raw Materials
 Wood x 28  
 Grey Clay x 10  
 Crude Oil x 6  
 Red Clay x 6  
 Iron Ore x 30  
 Original Rubber x 24  

Tasks
 Naphtha x 5 (100 minute(s) with Crude Oil Equipment)
 Acrylic Plate x 5 (20 minute(s) with Hot Kiln)
 Rubber x 12 (12 minute(s) with Low-Temperature Kiln)
 Tires x 2 (8 minute(s) with Hot Kiln)
 Charcoal x 8 (8 minute(s) with Low-Temperature Kiln)
 Steel x 4 (8 minute(s) with Hot Kiln)
 Bearing x 1 (15 minute(s) with Grinding Equipment)
 Heavy Oil x 1 (20 minute(s) with Crude Oil Equipment)
 Lubricant x 1 (12 minute(s) with Centrifuge)
 Iron Material x 15 (30 minute(s) with Melting Furnace)
 Ordinary Wood x 53 (0 minute(s) with Stone Knife)
 Firewood x 105 (0 minute(s) with Stone Knife)
 Ceramic Cylinder x 2 (8 minute(s) with Hot Kiln)
 Small Engine x 1 (12 minute(s) with Brand Iron)
 Motorbike x 1 (50 minute(s) with Large Assembly Tool)

New Manufacture | Edit | Back