Total Time: 303 minute(s)
Raw Materials |
---|
 Wood x 28   |
 Grey Clay x 10   |
 Crude Oil x 6   |
 Red Clay x 6   |
 Iron Ore x 30   |
 Original Rubber x 24   |
Tasks |
---|
 Naphtha x 5 (100 minute(s) with Crude Oil Equipment) |
 Acrylic Plate x 5 (20 minute(s) with Hot Kiln) |
 Rubber x 12 (12 minute(s) with Low-Temperature Kiln) |
 Tires x 2 (8 minute(s) with Hot Kiln) |
 Charcoal x 8 (8 minute(s) with Low-Temperature Kiln) |
 Steel x 4 (8 minute(s) with Hot Kiln) |
 Bearing x 1 (15 minute(s) with Grinding Equipment) |
 Heavy Oil x 1 (20 minute(s) with Crude Oil Equipment) |
 Lubricant x 1 (12 minute(s) with Centrifuge) |
 Iron Material x 15 (30 minute(s) with Melting Furnace) |
 Ordinary Wood x 53 (0 minute(s) with Stone Knife) |
 Firewood x 105 (0 minute(s) with Stone Knife) |
 Ceramic Cylinder x 2 (8 minute(s) with Hot Kiln) |
 Small Engine x 1 (12 minute(s) with Brand Iron) |
 Motorbike x 1 (50 minute(s) with Large Assembly Tool) |
New Manufacture | Edit | Back