Total Time: 145 minute(s)
Raw Materials |
---|
 Wood x 17   |
 Crude Oil x 40   |
Tasks |
---|
 Ordinary Wood x 33 (0 minute(s) with Stone Knife) |
 Firewood x 66 (0 minute(s) with Stone Knife) |
 Oil x 8 (120 minute(s) with Crude Oil Equipment) |
 Liquid Gas x 1 (25 minute(s) with Crude Oil Equipment) |
New Manufacture | Edit | Back