Expand All | Collapse All


Total Time: 18 minute(s)

Raw Materials
 Harl Grass x 30  

Tasks
 Linen Thread x 15 (15 minute(s) with Spinning Machine)
 Linen x 2 (2 minute(s) with Loom)
 Linen Carpet x 1 (1 minute(s) with Auto Loom)

New Manufacture | Edit | Back