Total Time: 18 minute(s)
Raw Materials |
---|
 Harl Grass x 30   |
Tasks |
---|
 Linen Thread x 15 (15 minute(s) with Spinning Machine) |
 Linen x 2 (2 minute(s) with Loom) |
 Linen Carpet x 1 (1 minute(s) with Auto Loom) |
New Manufacture | Edit | Back