Total Time: 33 minute(s)
Raw Materials |
---|
 Harl Grass x 20   |
 Lauan x 2   |
 Oak x 1   |
Tasks |
---|
 Linen Thread x 10 (10 minute(s) with Spinning Machine) |
 Linen Rope x 5 (5 minute(s) with Spinning Machine) |
 Oak Wood x 2 (0 minute(s) with Stone Knife) |
 Medium Wooden Gear x 4 (8 minute(s) with Rope Saw) |
 Lauan Wood x 3 (0 minute(s) with Stone Knife) |
 Wooden Axle x 1 (0 minute(s) with Stone Knife) |
 Driving Device x 1 (10 minute(s) with Bench Saw) |
New Manufacture | Edit | Back