Total Time: 215 minute(s)
Raw Materials |
---|
 Copper Ore x 12   |
 Wood x 28   |
 Crude Oil x 4   |
 Lauan x 1   |
 Iron Ore x 32   |
 Paper Grass x 40   |
 Clay x 10   |
 Original Rubber x 6   |
Tasks |
---|
 Copper Sand x 12 (24 minute(s) with Melting Furnace) |
 Copper x 6 (6 minute(s) with Melting Furnace) |
 Wires x 3 (3 minute(s) with Low-Temperature Kiln) |
 Charcoal x 10 (10 minute(s) with Low-Temperature Kiln) |
 Iron Material x 16 (32 minute(s) with Melting Furnace) |
 Steel x 5 (10 minute(s) with Hot Kiln) |
 Pan x 1 (4 minute(s) with Hot Kiln) |
 Satellite Antenna x 1 (20 minute(s) with Welding Tool) |
 Paper x 20 (20 minute(s) with Paper Machine) |
 Ordinary Wood x 52 (0 minute(s) with Stone Knife) |
 Firewood x 103 (0 minute(s) with Stone Knife) |
 Plastic x 4 (80 minute(s) with Crude Oil Equipment) |
 Lauan Wood x 1 (0 minute(s) with Stone Knife) |
 Small Wooden Gear x 2 (0 minute(s) with Wooden Saw) |
 Globe x 1 (6 minute(s) with Great Driver) |
New Manufacture | Edit | Back