Total Time: 54 minute(s)
Raw Materials |
---|
 Wood x 7   |
 Grey Clay x 4   |
 Crude Oil x 1   |
 Red Clay x 3   |
 Iron Ore x 6   |
Tasks |
---|
 Heavy Oil x 1 (20 minute(s) with Crude Oil Equipment) |
 Lubricant x 1 (12 minute(s) with Centrifuge) |
 Iron Material x 3 (6 minute(s) with Melting Furnace) |
 Ordinary Wood x 11 (0 minute(s) with Stone Knife) |
 Firewood x 21 (0 minute(s) with Stone Knife) |
 Ceramic Cylinder x 1 (4 minute(s) with Hot Kiln) |
 Small Engine x 1 (12 minute(s) with Brand Iron) |
New Manufacture | Edit | Back