Total Time: 684 minute(s)
Raw Materials |
---|
 Copper Ore x 78   |
 Wood x 116   |
 Tin Ore x 12   |
 Aluminum Ore x 30   |
 Crude Oil x 6   |
 Lauan x 5   |
 Iron Ore x 76   |
 Oak x 5   |
 Magnet x 2   |
 Original Rubber x 36   |
Tasks |
---|
 Iron Fillet x 1 (2 minute(s) with Melting Furnace) |
 Enamel Wire x 2 (4 minute(s) with Melting Furnace) |
 Iron Shell x 5 (15 minute(s) with Melting Furnace) |
 AC Motor x 1 (16 minute(s) with Grinding Equipment) |
 Aluminum Block x 10 (20 minute(s) with Melting Furnace) |
 Aluminum Plate x 5 (10 minute(s) with Training Platform) |
 Copper Material x 5 (10 minute(s) with Melting Furnace) |
 Copper Plate x 5 (10 minute(s) with Training Platform) |
 Alloy x 5 (25 minute(s) with Melting Furnace) |
 Rubber x 10 (10 minute(s) with Low-Temperature Kiln) |
 Cable x 2 (4 minute(s) with Melting Furnace) |
 Tin Block x 4 (8 minute(s) with Melting Furnace) |
 Tin Material x 2 (4 minute(s) with Melting Furnace) |
 Copper Block x 12 (24 minute(s) with Melting Furnace) |
 Electronic Wire x 1 (4 minute(s) with Hot Kiln) |
 Wires x 8 (8 minute(s) with Low-Temperature Kiln) |
 Special Nail x 4 (1 minute(s) with Melting Furnace) |
 Copper Sand x 40 (80 minute(s) with Melting Furnace) |
 Copper x 20 (20 minute(s) with Melting Furnace) |
 Sophisticated Device x 1 (10 minute(s) with Brand Iron) |
 Heavy Oil x 6 (120 minute(s) with Crude Oil Equipment) |
 Lubricant x 6 (72 minute(s) with Centrifuge) |
 Charcoal x 16 (16 minute(s) with Low-Temperature Kiln) |
 Ordinary Wood x 220 (0 minute(s) with Stone Knife) |
 Firewood x 437 (0 minute(s) with Stone Knife) |
 Iron Material x 35 (70 minute(s) with Melting Furnace) |
 Steel x 8 (16 minute(s) with Hot Kiln) |
 Metal Gear x 3 (9 minute(s) with Melting Furnace) |
 Small Wooden Gear x 12 (0 minute(s) with Wooden Saw) |
 Oak Wood x 9 (0 minute(s) with Stone Knife) |
 Medium Wooden Gear x 18 (36 minute(s) with Rope Saw) |
 Lauan Wood x 10 (0 minute(s) with Stone Knife) |
 Big Wooden Gear x 6 (24 minute(s) with Rope Saw) |
 Link Gear Unit x 3 (6 minute(s) with Great Driver) |
 Elevator x 1 (30 minute(s) with Large Assembly Tool) |
New Manufacture | Edit | Back