Total Time: 3 minute(s)
Raw Materials |
---|
 Harl Grass x 4   |
Tasks |
---|
 Linen Thread x 2 (2 minute(s) with Spinning Machine) |
 Linen Rope x 1 (1 minute(s) with Spinning Machine) |
New Manufacture | Edit | Back
Raw Materials |
---|
 Harl Grass x 4   |
Tasks |
---|
 Linen Thread x 2 (2 minute(s) with Spinning Machine) |
 Linen Rope x 1 (1 minute(s) with Spinning Machine) |