Expand All | Collapse All


Total Time: 35 minute(s)

Raw Materials
 Harl Grass x 6  
 Sea Water x 40  
 Cotton x 4  

Tasks
 Linen Thread x 3 (3 minute(s) with Spinning Machine)
 Cotton Thread x 4 (4 minute(s) with Spinning Machine)
 Cotton Cloth x 2 (2 minute(s) with Loom)
 Pure Water x 10 (0 minute(s) with Automatic Filter)
 Ice Pack x 1 (26 minute(s) with Fridge)

New Manufacture | Edit | Back