Total Time: 35 minute(s)
Raw Materials |
---|
 Harl Grass x 6   |
 Sea Water x 40   |
 Cotton x 4   |
Tasks |
---|
 Linen Thread x 3 (3 minute(s) with Spinning Machine) |
 Cotton Thread x 4 (4 minute(s) with Spinning Machine) |
 Cotton Cloth x 2 (2 minute(s) with Loom) |
 Pure Water x 10 (0 minute(s) with Automatic Filter) |
 Ice Pack x 1 (26 minute(s) with Fridge) |
New Manufacture | Edit | Back