Total Time: 19 minute(s)
Raw Materials |
---|
 Lauan x 6   |
 Paper Grass x 10   |
 Yellow Clay x 4   |
 Cotton x 4   |
 Black Clay x 10   |
Tasks |
---|
 Cotton Thread x 4 (4 minute(s) with Spinning Machine) |
 Cotton Cloth x 2 (2 minute(s) with Loom) |
 Paper x 5 (5 minute(s) with Paper Machine) |
 Lauan Wood x 12 (0 minute(s) with Stone Knife) |
 Message Board x 1 (8 minute(s) with Rope Saw) |
New Manufacture | Edit | Back