Expand All | Collapse All


Total Time: 37 minute(s)

Raw Materials
 Wood x 4  
 Sea Water x 12  

Tasks
 Ordinary Wood x 8 (0 minute(s) with Stone Knife)
 Firewood x 16 (0 minute(s) with Stone Knife)
 Gas x 48 (0 minute(s) with Crude Oil Equipment)
 Fresh Water x 12 (0 minute(s) with Water Desalination)
 Bottled Boiled Water x 12 (12 minute(s) with Glaze Table)
 Bottled Hot Water x 1 (25 minute(s) with Automatic Filter)

New Manufacture | Edit | Back