Total Time: 927 minute(s)
Raw Materials |
---|
 White Clay x 4   |
 Copper Ore x 116   |
 Wood x 158   |
 Harl Grass x 66   |
 Grey Clay x 20   |
 Aluminum Ore x 24   |
 Lauan x 7   |
 Crude Oil x 4   |
 Red Clay x 12   |
 Iron Ore x 118   |
 Oak x 1   |
 Mica Rock x 2   |
 Original Rubber x 48   |
Tasks |
---|
 Aluminum Block x 8 (16 minute(s) with Melting Furnace) |
 Aluminum Plate x 4 (8 minute(s) with Training Platform) |
 Copper Block x 8 (16 minute(s) with Melting Furnace) |
 Copper Material x 4 (8 minute(s) with Melting Furnace) |
 Copper Plate x 4 (8 minute(s) with Training Platform) |
 Alloy x 4 (20 minute(s) with Melting Furnace) |
 Resistance x 10 (16 minute(s) with Hot Kiln) |
 Wire x 6 (12 minute(s) with Melting Furnace) |
 Capacitance x 8 (8 minute(s) with Hot Kiln) |
 Filtering Circuit x 2 (16 minute(s) with Brand Iron) |
 Rectifier Line x 2 (2 minute(s) with Low-Temperature Kiln) |
 Rectifier x 2 (20 minute(s) with Brand Iron) |
 Copper Sand x 92 (184 minute(s) with Melting Furnace) |
 Copper x 46 (46 minute(s) with Melting Furnace) |
 Wires x 22 (22 minute(s) with Low-Temperature Kiln) |
 DC Generator x 2 (16 minute(s) with Brand Iron) |
 Linen x 3 (3 minute(s) with Loom) |
 Main Mast x 1 (8 minute(s) with Bench Saw) |
 Charcoal x 28 (28 minute(s) with Low-Temperature Kiln) |
 Steel x 14 (28 minute(s) with Hot Kiln) |
 Wooden Winch x 1 (8 minute(s) with Rope Saw) |
 Nail x 8 (4 minute(s) with Melting Furnace) |
 Linen Thread x 33 (33 minute(s) with Spinning Machine) |
 Linen Rope x 9 (9 minute(s) with Spinning Machine) |
 Oak Wood x 2 (0 minute(s) with Stone Knife) |
 Medium Wooden Gear x 3 (8 minute(s) with Rope Saw) |
 Lauan Wood x 12 (0 minute(s) with Stone Knife) |
 Massive Capstan x 1 (16 minute(s) with Carpenters Lathe) |
 Heavy Oil x 4 (80 minute(s) with Crude Oil Equipment) |
 Lubricant x 4 (48 minute(s) with Centrifuge) |
 Iron Material x 56 (112 minute(s) with Melting Furnace) |
 Ordinary Wood x 309 (0 minute(s) with Stone Knife) |
 Firewood x 618 (0 minute(s) with Stone Knife) |
 Ceramic Cylinder x 4 (16 minute(s) with Hot Kiln) |
 Small Engine x 4 (48 minute(s) with Brand Iron) |
 Yacht x 1 (60 minute(s) with Large Assembly Tool) |
New Manufacture | Edit | Back