Total Time: 578 minute(s)
Raw Materials |
---|
 White Clay x 1   |
 Wood x 118   |
 Grey Clay x 12   |
 Red Clay x 6   |
 Iron Ore x 206   |
 Original Rubber x 8   |
 Black Clay x 1   |
Tasks |
---|
 Rubber x 4 (4 minute(s) with Low-Temperature Kiln) |
 Tires x 4 (16 minute(s) with Hot Kiln) |
 Bearing x 4 (60 minute(s) with Grinding Equipment) |
 Small Fuel Tank x 2 (20 minute(s) with Grinding Equipment) |
 Valving x 1 (8 minute(s) with Hot Kiln) |
 Wire x 2 (4 minute(s) with Melting Furnace) |
 Rivet x 8 (8 minute(s) with Grinding Equipment) |
 Charcoal x 68 (68 minute(s) with Low-Temperature Kiln) |
 Iron Material x 102 (204 minute(s) with Melting Furnace) |
 Steel x 34 (68 minute(s) with Hot Kiln) |
 Carburetor x 1 (20 minute(s) with Grinding Equipment) |
 Ordinary Wood x 229 (0 minute(s) with Stone Knife) |
 Firewood x 458 (0 minute(s) with Stone Knife) |
 Ceramic Cylinder x 2 (8 minute(s) with Hot Kiln) |
 Large Engine x 1 (30 minute(s) with Welding Tool) |
 Cabriolet (convertible) x 1 (60 minute(s) with Large Assembly Tool) |
New Manufacture | Edit | Back