Total Time: 468 minute(s)
| Raw Materials |
|---|
  White Clay x 1   |
  Wood x 94   |
  Grey Clay x 12   |
  Red Clay x 6   |
  Iron Ore x 158   |
  Original Rubber x 8   |
  Black Clay x 1   |
| Tasks |
|---|
  Rubber x 4 (4 minute(s) with Low-Temperature Kiln) |
  Tires x 4 (16 minute(s) with Hot Kiln) |
  Bearing x 2 (30 minute(s) with Grinding Equipment) |
  Small Fuel Tank x 2 (20 minute(s) with Grinding Equipment) |
  Valving x 1 (8 minute(s) with Hot Kiln) |
  Wire x 2 (4 minute(s) with Melting Furnace) |
  Rivet x 8 (8 minute(s) with Grinding Equipment) |
  Charcoal x 52 (52 minute(s) with Low-Temperature Kiln) |
  Iron Material x 78 (156 minute(s) with Melting Furnace) |
  Steel x 26 (52 minute(s) with Hot Kiln) |
  Carburetor x 1 (20 minute(s) with Grinding Equipment) |
  Ordinary Wood x 181 (0 minute(s) with Stone Knife) |
  Firewood x 362 (0 minute(s) with Stone Knife) |
  Ceramic Cylinder x 2 (8 minute(s) with Hot Kiln) |
  Large Engine x 1 (30 minute(s) with Welding Tool) |
  Turtle Car x 1 (60 minute(s) with Large Assembly Tool) |
New Manufacture | Edit | Back





























