Total Time: 48 minute(s)
Raw Materials |
---|
 Lauan x 8   |
Tasks |
---|
 Small Wooden Gear x 6 (0 minute(s) with Wooden Saw) |
 Wooden Winch x 2 (16 minute(s) with Rope Saw) |
 Wooden Axle x 2 (0 minute(s) with Stone Knife) |
 Lauan Wood x 16 (0 minute(s) with Stone Knife) |
 Auto Loom x 1 (32 minute(s) with Carpenters Lathe) |
New Manufacture | Edit | Back