Total Time: 32 minute(s)
Raw Materials |
---|
 Wood x 3   |
 Crude Oil x 1   |
Tasks |
---|
 Ordinary Wood x 4 (0 minute(s) with Stone Knife) |
 Firewood x 7 (0 minute(s) with Stone Knife) |
 Heavy Oil x 1 (20 minute(s) with Crude Oil Equipment) |
 Lubricant x 1 (12 minute(s) with Centrifuge) |
New Manufacture | Edit | Back