Total Time: 50 minute(s)
Raw Materials |
---|
 Wood x 7   |
 Crude Oil x 10   |
Tasks |
---|
 Ordinary Wood x 14 (0 minute(s) with Stone Knife) |
 Firewood x 28 (0 minute(s) with Stone Knife) |
 Oil x 2 (30 minute(s) with Crude Oil Equipment) |
 Unleaded Gasoline x 1 (20 minute(s) with Crude Oil Equipment) |
New Manufacture | Edit | Back