Total Time: 47 minute(s)
Raw Materials |
---|
 Wood x 3   |
 Harl Grass x 10   |
 Sea Water x 1   |
 Iron Ore x 3   |
 Coal Ore x 1   |
 Cotton x 8   |
Tasks |
---|
 Linen Thread x 5 (5 minute(s) with Spinning Machine) |
 Wire x 3 (6 minute(s) with Melting Furnace) |
 Fresh Water x 1 (0 minute(s) with Water Desalination) |
 Ordinary Wood x 4 (0 minute(s) with Stone Knife) |
 Firewood x 5 (0 minute(s) with Stone Knife) |
 Coal Sand x 1 (2 minute(s) with Hot Kiln) |
 Coal Ball x 1 (2 minute(s) with Hot Kiln) |
 Nylon x 1 (4 minute(s) with Hot Kiln) |
 Cotton Thread x 8 (8 minute(s) with Spinning Machine) |
 Cotton Cloth x 4 (4 minute(s) with Loom) |
 Sofa x 1 (16 minute(s) with Auto Loom) |
New Manufacture | Edit | Back