Total Time: 6 minute(s)
Raw Materials |
---|
 Harl Grass x 8   |
Tasks |
---|
 Linen Thread x 4 (4 minute(s) with Spinning Machine) |
 Lasso x 1 (2 minute(s) with Auto Machine) |
New Manufacture | Edit | Back
Raw Materials |
---|
 Harl Grass x 8   |
Tasks |
---|
 Linen Thread x 4 (4 minute(s) with Spinning Machine) |
 Lasso x 1 (2 minute(s) with Auto Machine) |