Total Time: 24 minute(s)
Raw Materials |
---|
 Wood x 3   |
 Grey Clay x 1   |
 Iron Ore x 8   |
 Original Rubber x 4   |
Tasks |
---|
 Tires x 1 (4 minute(s) with Hot Kiln) |
 Ordinary Wood x 6 (0 minute(s) with Stone Knife) |
 Firewood x 12 (0 minute(s) with Stone Knife) |
 Iron Material x 4 (8 minute(s) with Melting Furnace) |
 Rubber x 2 (2 minute(s) with Low-Temperature Kiln) |
 Handcart x 1 (10 minute(s) with Grinding Equipment) |
New Manufacture | Edit | Back