Expand All | Collapse All


Total Time: 62 minute(s)

Raw Materials
 Wood x 2  
 Harl Grass x 50  
 Cypress x 3  
 Iron Ore x 4  
 Cotton x 8  

Tasks
 Cotton Thread x 8 (8 minute(s) with Spinning Machine)
 Cotton Cloth x 4 (4 minute(s) with Loom)
 Linen Thread x 25 (25 minute(s) with Spinning Machine)
 Linen x 5 (5 minute(s) with Loom)
 Ordinary Wood x 3 (0 minute(s) with Stone Knife)
 Firewood x 6 (0 minute(s) with Stone Knife)
 Iron Material x 2 (4 minute(s) with Melting Furnace)
 Nail x 12 (4 minute(s) with Melting Furnace)
 Cypress Wood x 5 (0 minute(s) with Stone Knife)
 Wooden Bed x 1 (12 minute(s) with Bench Saw)

New Manufacture | Edit | Back