Total Time: 62 minute(s)
Raw Materials |
---|
 Wood x 2   |
 Harl Grass x 50   |
 Cypress x 3   |
 Iron Ore x 4   |
 Cotton x 8   |
Tasks |
---|
 Cotton Thread x 8 (8 minute(s) with Spinning Machine) |
 Cotton Cloth x 4 (4 minute(s) with Loom) |
 Linen Thread x 25 (25 minute(s) with Spinning Machine) |
 Linen x 5 (5 minute(s) with Loom) |
 Ordinary Wood x 3 (0 minute(s) with Stone Knife) |
 Firewood x 6 (0 minute(s) with Stone Knife) |
 Iron Material x 2 (4 minute(s) with Melting Furnace) |
 Nail x 12 (4 minute(s) with Melting Furnace) |
 Cypress Wood x 5 (0 minute(s) with Stone Knife) |
 Wooden Bed x 1 (12 minute(s) with Bench Saw) |
New Manufacture | Edit | Back