Expand All | Collapse All


Total Time: 16 minute(s)

Raw Materials
 Wood x 4  
 Iron Ore x 6  

Tasks
 Charcoal x 2 (2 minute(s) with Low-Temperature Kiln)
 Ordinary Wood x 6 (0 minute(s) with Stone Knife)
 Firewood x 12 (0 minute(s) with Stone Knife)
 Iron Material x 3 (6 minute(s) with Melting Furnace)
 Steel x 1 (2 minute(s) with Hot Kiln)
 Great Driver x 1 (6 minute(s) with Training Platform)

New Manufacture | Edit | Back