Total Time: 6 minute(s)
Raw Materials |
---|
 Harl Grass x 10   |
Tasks |
---|
 Linen Thread x 5 (5 minute(s) with Spinning Machine) |
 Linen x 1 (1 minute(s) with Loom) |
New Manufacture | Edit | Back
Raw Materials |
---|
 Harl Grass x 10   |
Tasks |
---|
 Linen Thread x 5 (5 minute(s) with Spinning Machine) |
 Linen x 1 (1 minute(s) with Loom) |